Spare parts spare parts, the DCS control system of PLC system and the robot system spare parts,
Brand advantage: Allen Bradley, BentlyNevada, ABB, Emerson Ovation, Honeywell DCS, Rockwell ICS Triplex, FOXBORO, Schneider PLC, GE Fanuc, Motorola, HIMA, TRICONEX, Prosoft etc. Various kinds of imported industrial parts
Products are widely used in metallurgy, petroleum, glass, aluminum manufacturing, petrochemical industry, coal mine, papermaking, printing, textile printing and dyeing, machinery, electronics, automobile manufacturing, tobacco, plastics machinery, electric power, water conservancy, water treatment/environmental protection, municipal engineering, boiler heating, energy, power transmission and distribution and so on.
This section provides information on installing the SC510 chassis into a rack unit There are a variety of rack units on the market, which may mean the assembly procedure will differ slightly. You should also refer to the installation instructions that came with the rack unit you are using.Installing the Chassis into a Rack: 1. Confirm that chassis includes the four mounting screws required to mount the chassis into a rack 2. Align the thru-holes of the chassis with the thru-holes of the rack. 3. Insert the mounting screws into the thru-holes in the front of the chassis and through the thru-holes in the rack Purpose The Excel 800 System is an independently mounted electronic control system with fixed wiring. It is used for the purpose of building HVAC control and is suitable for use only in non-safety controls for installation on or in appliances. 75 °C for all housing and plastic parts 125 °C in the case of devices applied with voltage-carrying parts and connectors
► When performing any work (installation, mounting, startup), all instructions given by the manufacturer and in particular the safety instructions provided in these Installation and Commissioning Instructions are to be observed. ► The Excel 800 System (including the XCL8010 Controller Module, I/O modules, manual disconnect modules, and the auxiliary terminal packages) may be installed and mounted only by authorized and trained personnel. ► Rules regarding electrostatic discharge should be followed. ► If the Excel 800 System is modified in any way, except by the manufacturer, all warranties concerning operation and safety are invalidated. ► Make sure that the local standards and regulations are observed at all times. Examples of such regulations are VDE 0800 and VDE 0100 or EN 60204-1 for earth grounding. ► Use only accessory equipment which comes from or has been approved by Honeywell. ► It is recommended that devices are to be kept at room temperature for at least 24 hours before applying power. This is to allow any condensation resulting from low shipping/storage temperatures to evaporate. ► The Excel 800 System must be installed in such a manner (e.g., in a lockable cabinet) as to ensure that uncertified persons have no access to the terminals.