Product Details Introduction:
Minimum design requirements. The design of each ground system is unique to the particular facility and the conditions present. However, a minimum set of requirements shall be considered for each facility. (1) At each facility supplied by electric power, at least one ground rod should be installed near the service disconnecting means and bonded to the earth electrode subsystem. If the transformer is located on the site, a bare 1/0 AWG wire or cable should interconnect the ground rod at the transformer with the earth electrode subsystem at the first service disconnect for lightning protection purposes.
Main products of the company
We focus on DCS, PLC, robot control system and large servo systems.
Main business: DCS system, PLC spare parts, various modules/cards, controllers, touch screens, servo drives.
Main brands ABB Bailey, GE/FANC, FOXBORO, Invensys TRICONEX, Bentley BENTLY, A-B Rockwell, Emerson, OVATION, MOTOROLA, XYVOM, Honeywell HONEYWELL, Rexroth, KUKA, NI, DEIF, Yokogawa, Woodward WOODWARD, Ryan, Schneider SCHNEIDER, Yaskawa, Moog, PROSOFT, etc
This article from the temporal Ming sheng automation equipment co., LTD., reproduced please attach this link: http://www.stockdcs.com/