Spare parts spare parts, the DCS control system of PLC system and the robot system spare parts,
Brand advantage: Allen Bradley, BentlyNevada, ABB, Emerson Ovation, Honeywell DCS, Rockwell ICS Triplex, FOXBORO, Schneider PLC, GE Fanuc, Motorola, HIMA, TRICONEX, Prosoft etc. Various kinds of imported industrial parts
Products are widely used in metallurgy, petroleum, glass, aluminum manufacturing, petrochemical industry, coal mine, papermaking, printing, textile printing and dyeing, machinery, electronics, automobile manufacturing, tobacco, plastics machinery, electric power, water conservancy, water treatment/environmental protection, municipal engineering, boiler heating, energy, power transmission and distribution and so on.
This section explains the steps necessary to install the modules of an INICI03 Cnet-to-Computer Interface: INNIS01 Network Interface, INICT03 Computer Transfer, and IMMPI01 Multifunction Processor Interface. Read, understand, and complete the steps in the order they appear before operating the modules. Special Handling Observe these steps when handling electronic circuitry: NOTE: Always use Elsag Bailey’s field static kit (part number 1948385A1 - consisting of two wrist straps, ground cord assembly, alligator clip, and static dissipating work surface) when working with the modules. The kit is designed to connect the technician and the static dissipating work surface to the same ground point to prevent damage to the modules by electrostatic discharge. 1. Use Static Shielding Bag. Keep the modules in the static shielding bag until you are ready to install them in the system. Save the packaging for future use. 2. Ground Bags before Opening. Before opening a bag containing an assembly with semiconductors, touch it to the equipment housing or a ground to equalize charges. 3. Avoid Touching Circuitry. Handle assemblies by the edges; avoid touching the circuitry. 4. Avoid Partial Connection of Semiconductors. Verify that all devices connected to the module are properly grounded before using them. 5. Ground Test Equipment. 6. Use Antistatic Field Service Vacuum. Remove dust from the module if necessary.
1. Examine the hardware immediately for shipping damage. 2. Notify the nearest Elsag Bailey sales office of any such damage. 3. File a claim for any damage with the transportation company that handled the shipment. 4. Use the original packing material and container to store the hardware. 5. Store the hardware in an environment of good air quality, free from temperature and moisture extremes. INICI03 Wiring and Cabling Figure 3-1 is a wiring and cabling diagram for the INICI03 interface. Refer to this figure when installing and connecting the interface modules. INNIS01 Network Interface The Cnet-to-computer interface requires an INNIS01 Network Interface module. Both dipswitches and jumpers must be set before putting the module into operation. Figure 3-2 shows the dipswitch and jumper locations on the module. Dipswitch Settings The INNIS01 module has four dipswitches that set the module operating characteristics. The dipswitches set the node address, loop address, loop mode, I/O expander bus address (i.e., module address), and event and error counter options. Refer to Figure 3-2 for dipswitch locations.