Ovation 1C31110G02 Analog output module
Inspections of the system should be implemented as integral elements of the facility during the construction of the building or structure. To ensure that the implementation is accomplished in a timely manner, the construction efforts should be carefully monitored. Prior to acceptance of the facility, the installation should be validated as acceptable using DA Form 7452-2-R shown in figure 3-31. The following guidelines are provided to aid in the inspection and checkout of the facility. (1) The zone of protection established by the air terminals (or by the mast or overhead ground wire, if a separately installed system is provided) shall be determined. Locate air terminals on a scaled drawing of the structure (be sure to include all views). Verify all parts of the facility are adequately included within the zones of protection established by the air terminals. In deficient areas, determine what additional measures, if any, need to be taken.
Company advantages
Main brands: ABB, GE/FANC, FOXBORO, Invensys TRICONEX, Bentley BENTLY, A-B Rockwell, Emerson, OVATION, MOTOROLA, XYVOM, Honeywell HONEYWELL, Rexroth, KUKA, NI, DEIF, Yokogawa, Woodward WOODWARD, Ryan, Schneider SCHNEIDER, Yaskawa, Moog, PROSOFT, etc
Application industry: widely used in metallurgy, oil and gas, glass manufacturing, aluminum, petrochemical, coal mine, paper and printing, textile printing, machinery, electronic manufacturing, automobile manufacturing, tobacco, plastic machinery, electricity, water conservancy, water treatment/environmental protection, municipal engineering, boiler heating, energy, power transmission and distribution, etc.
This article from the temporal Ming sheng automation equipment co., LTD., reproduced please attach this link: http://www.stockdcs.com/