GE DS200GDPAG1ALF Switch output module
At power-up, the 2301D-ST runs through its boot-up routine and performs a set of initial diagnostics to verify CPU, memory and bus health. This boot-up routine takes approximately 30 seconds to execute. During this time, the control’s red status LED (located between terminals 27 and 28) should be on. When boot-up is complete, the application program code begins running, the control outputs will be enabled and system control will begin - the control’s red status LED will be turned off and should remain off as long as the control is running.
Initial 2301D-ST Communications:
Before communications can begin between the Watch Window program and a control, a network definition file must be created. Once this network definition file is created and saved, it never has to be recreated. To create a network definition file: 1. Open the Watch Window program’s associated Servlink server by Clicking on Start > Programs > Woodward > Servlink Server.exe 2. Select the communications port the control is connected to 3. Select “Point-to-Point” communications 4. Select the a Baud Rate of 38400 5. Select the OK button
Professional seller
Professional sales of major electrical brand products in the world
Overseas direct purchase of products, authentic inventory, price concessions
After sales warranty, complete models, same products, different prices and services
This article from the temporal Ming sheng automation equipment co., LTD., reproduced please attach this link: http://www.stockdcs.com/