GE IC693CPU323 Controller card
Verify that all metallic penetrations and shielded cables through the facility shield are bonded to the entry plate. (17) Verify that each RF coaxial cable is bonded to the entry plate with a metal bulkhead connector, which is bonded to the building entry plate and grounded to the earth electrode subsystem. (18) Verify that the shields of all telephone cables entering the facility are bonded to each other and to the earth electrode subsystem through the steel entry plate. (19) Verify filters specified in the design are installed as shown on the engineering drawings. (20) Verify all power line filter cases are directly bonded to the equipment case or enclosure. (21) Verify filters are bonded to any subassembly enclosure used to maintain shield effectiveness. (22) Verify filters on power, control, and signal lines are installed in a manner that maintains the integrity of the shield.
About our company
1.Focus on DCS, PLC, robot control system and large servo system. Main products: various modules/cards, controllers, touch screens, servo drives.
2.Advantages: We supply imported genuine products, professional off production accessories, fast delivery and accurate delivery.
3.Main brands: ABB, GE/FANC, FOXBORO, Invensys TRICONEX, Bentley BENTLY, A-B Rockwell, Emerson, OVATION, MOTOROLA, XYVOM, Honeywell HONEYWELL, Rexroth, KUKA, NI, DEIF, Yokogawa, Woodward WOODWARD, Ryan, Schneider SCHNEIDER, Yaskawa, Moog, PROSOFT, etc
This article from the temporal Ming sheng automation equipment co., LTD., reproduced please attach this link: http://www.stockdcs.com/