GE IC693MDL340 output module
GE IC693MDL340 output module
(5) Major deficiencies should be the subject of a major discrepancy report. After major deficiencies are corrected, the facility should be re-inspected. File the inspection report. b. Electrical testing. Electrical testing of the earth electrode subsystem should be conducted every 24 months per NETA guidelines. (1) Measure the resistance to earth of the earth electrode subsystem using the fall of potential method. Test directly in a ground well if available. If not, connect to a signal ground cable, the power system grounding conductor, a lightning down conductor, or a structural grounding connection. (2) Measure stray current in grounding conductor between service disconnecting means and earth electrode subsystem (current reading).
Main business of the company
1.Focus on DCS, PLC, robot control system and large servo system. Main products: various modules/cards, controllers, touch screens, servo drives.
2.Advantages: We supply imported genuine products, professional off production accessories, fast delivery and accurate delivery.
3.Main brands: ABB, GE/FANC, FOXBORO, Invensys TRICONEX, Bentley BENTLY, A-B Rockwell, Emerson, OVATION, MOTOROLA, XYVOM, Honeywell HONEYWELL, Rexroth, KUKA, NI, DEIF, Yokogawa, Woodward WOODWARD, Ryan, Schneider SCHNEIDER, Yaskawa, Moog, PROSOFT, etc
This article from the temporal Ming sheng automation equipment co., LTD., reproduced please attach this link: http://www.stockdcs.com/