Home > Product > Gas turbine system > GE IC660BBD110 Communication adapter communication

  • GE IC660BBD110 Communication adapter communication
GE IC660BBD110 Communication adapter communication

GE IC660BBD110 Communication adapter communication

GE IC660BBD110 Communication adapter communication


GE IC660BBD110 Communication adapter communication

b. Electrical testing. Electrical testing of the fault protection subsystem should be conducted every 24 months per NETA guidelines. (1) With neutral disconnected at first service disconnect, the resistance to ground should be at least one megohm. (New ground resistance testers on the market today do not require that the neutral conductor be disconnected.) (2) Perform spot check resistance measurements on power receptacles and stray current measurements on safety ground to insure that the ground terminals on the receptacles are properly grounded to the facility ground system and no currents are flowing on grounding conductor. (3) Measure for stray currents at obvious locations. (4) Perform resistance tests of a sample of bonds as described earlier in this chapter

                                                                        

Main business of the company

1.Focus on DCS, PLC, robot control system and large servo system. Main products: various modules/cards, controllers, touch screens, servo drives.

2.Advantages: We supply imported genuine products, professional off production accessories, fast delivery and accurate delivery.

3.Main brands: ABB, GE/FANC, FOXBORO, Invensys TRICONEX, Bentley BENTLY, A-B Rockwell, Emerson, OVATION, MOTOROLA, XYVOM, Honeywell HONEYWELL, Rexroth, KUKA, NI, DEIF, Yokogawa, Woodward WOODWARD, Ryan, Schneider SCHNEIDER, Yaskawa, Moog, PROSOFT, etc

This article from the temporal Ming sheng automation equipment co., LTD., reproduced please attach this link: http://www.stockdcs.com/


Obtain the latest price of GE IC660BBD110 Communication adapter communication