GE IS200TDBTH6ABC MRP768176 Voltage monitoring card
Surrounding electrical devices should not exceed the electromagnetic field (EMC) standards for IEC 801-3, Level 2 (3V/M) field strength.
Make sure that the equipment receives adequate ventilation. Do not block the ventilation holes on each side of the equipment or the fan exhaust port on the side or rear of the equipment.
The power outlet should be within 1.8 meters of the equipment.
Install the Chassis
Rack Mounting Use the rackmount brackets and screws to install the chassis into any EIA 19” standard rack. Place the brackets on the sides of the chassis so that the screw holes are aligned. Use the bracket screws to securely attach the brackets to the chassis. Apply screws to each side and secure them tightly.
Payment method and delivery
Shipment: EMS,DHL,UPS & FEDEX
Payment: T/T or Western Union
Application industry
Our main products are widely used in metallurgy, oil and gas, glass manufacturing, aluminum, petrochemical, coal mine, paper making and printing, textile printing and dyeing, machinery, electronic manufacturing, automobile manufacturing, tobacco, plastic machinery, electricity, water conservancy, water treatment/environmental protection, municipal engineering, boiler heating, energy, power transmission and distribution, etc.
This article from the temporal Ming sheng automation equipment co., LTD., reproduced please attach this link: http://www.stockdcs.com/