Spare parts spare parts, the DCS control system of PLC system and the robot system spare parts,
Brand advantage: Allen Bradley, BentlyNevada, ABB, Emerson Ovation, Honeywell DCS, Rockwell ICS Triplex, FOXBORO, Schneider PLC, GE Fanuc, Motorola, HIMA, TRICONEX, Prosoft etc. Various kinds of imported industrial parts
Products are widely used in metallurgy, petroleum, glass, aluminum manufacturing, petrochemical industry, coal mine, papermaking, printing, textile printing and dyeing, machinery, electronics, automobile manufacturing, tobacco, plastics machinery, electric power, water conservancy, water treatment/environmental protection, municipal engineering, boiler heating, energy, power transmission and distribution and so on.
Further attention has to be paid to DIN VDE 0113 Part 1 and Part 200 in case of the control of working and processing machines. If operating elements are to be mounted near parts with dangerous contact voltage DIN VDE 0106 Part 100 is additionally relevant. If the protection against direct contact according to DIN VDE 0160 is required, this has to be ensured by the user (e.g. by incorporating the elements in a switch-gear cabinet). The devices are designed for pollution severity 2 in accordance with DIN VDE 0110 Part 1. If higher pollution is expected, the devices must be installed in appropriate housings. The user has to guarantee that the devices and the components belonging to them are mounted following these regulations. For operating the machines and installations, other national and international relevant regulations, concerning prevention of accidents and using technical working means, also have to be met.
The following has to be observed for project planning and start–up: Programming is performed using ABB Procontic programming software, which can be run on commercially available IBM compatible PCs (see documentation for the programming system 907 PC 331) Diagnosis and service device TCZ (terminal mode) (see volume 7.3, see chapter A5 (Appendix), Programming and test, see 2.3.14 Serial interface COM1) The processor processes the user program contained in the RAM. It is loaded into the RAM via the serial interface COM1 and can also be changed there. An additional save command is used to save the program in the Flash EPROM. The ABB Procontic devices are designed according to IEC 1131 Part 2. Meeting this regulation, they are classified in overvoltage category II which is in conformance with DIN VDE 0110 Part 2. For the direct connection of ABB Procontic devices, which are powered with or coupled to AC line voltages of overvoltage category III, appropriate protection measures corresponding to overvoltage category II according to IEC–Report 664/1980 and DIN VDE 0110 Part 1 are to install. Equivalent standards: DIN VDE 0110 Part 1 IEC 664 DIN VDE 0113 Part 1 EN 60204 Part 1 DIN VDE 0660 Part 500 EN 60439–1 IEC 439–1
If a PLC is used with an ARCnet interface, a certain section of the PLC TURBO program memory No. 2 is reserved for ARCnet. If programs with more than 2 k instructions are executed, the system-dependent capacity utilization can possibly be increased by reason of the reduced TURBO memory No. 2 when changes are made to a running program. There are no problems, if – the capacity utilization is less than 80 % before making changes to a running program or if – the program length is less than 2 k instructions. On-line program modification The two existing RAMs allow a quick modification of the user program to be performed without interrupting the operation (see ABB programming system 907 PC 331). Change-over between the application modes – Stand–alone central unit – Bus master central unit and – Slave central unit