EMERSON VE4001S2T2B4 Counter module
If LI is requested to include the chopped wave in this case the peak value of the chopped impulse shall be 10 % higher than for the full impulse ( i.e 10 % more ). For transformers with a high-voltage winding having Um > 72,5 kV, lightning impulse tests are routine tests for all windings of the transformer.
Warranty: 365 days Goods status: new/used Shipping method: Courier delivery
Our products
A company specializes in the sales of module spare parts of global famous brands (DCS system) (robot system) (large servo control system). The company's products include distributed control system (DCS), programmable controller (PLC), MOTOROLA MVME industrial module, industrial control communication converter (Anybus), remote output/input module (RTU), industrial computer (IPC), industrial low screen screen (IPC) HMI SCSI (50, 68, 80Pin) AnyBus (Gateway) has become a global sales enterprise of industrial automation spare parts and components
Repeated dielectric tests:
For transformers which have already been in service and have been refurbished or serviced, dielectric
tests shall be repeated at test levels of 80 % of the original values, unless otherwise agreed upon, and
provided that the internal insulation has not been modified. Long duration AC induced test ( ACLD )
shall always be repeated at 100 % test level. Repetition of tests required to prove that new transformer,
having been factory tested, is always performed at 100% of test level.
This article from the temporal Ming sheng automation equipment co., LTD., reproduced please attach this link: http://www.stockdcs.com/