EMERSON VE4050S2K1C0 Timer module
SEPARATE-SOURCE VOLTAGE WITHSTAND TEST The purpose of the test is testing the insulation between the windings and the insulation between windings and earthed parts (tank, press iron, etc.), under the temporary and switching over-voltages conditions which may be occurred during the service.
The tests, which are made with separate source voltage, shall be made at rated frequency or at a frequency not less than the 80 percent of the rated frequency. This allows the testing of 60 Hz transformers at 50 Hz. The waveform of voltage must be sinusoidal as much as possible and must be single phase.
Warranty: 365 days Goods status: new/used Shipping method: Courier delivery
Our products
A company specializes in the sales of module spare parts of global famous brands (DCS system) (robot system) (large servo control system). The company's products include distributed control system (DCS), programmable controller (PLC), MOTOROLA MVME industrial module, industrial control communication converter (Anybus), remote output/input module (RTU), industrial computer (IPC), industrial low screen screen (IPC) HMI SCSI (50, 68, 80Pin) AnyBus (Gateway) has become a global sales enterprise of industrial automation spare parts and components
The voltage is measured
using a capacitive voltage divider in conjunction with voltmeter response to
peak values. The peak voltmeter indicates the peak value divided by √2. The test duration is one
minute. The test voltage is applied to the winding which is going to be tested (all terminals of this
winding is short-circuited) while the terminals of the other windings are connected to each other, the
windings that are not under test voltage, tank and core also should be grounded. Secondary winding
terminals of the bushing type CT’s shall be connected to each other’s and grounded in order to prevent
unwanted sparkings.
This article from the temporal Ming sheng automation equipment co., LTD., reproduced please attach this link: http://www.stockdcs.com/