Transformers with U m < 72,5 kV normally , no partial discharge measurements are performed during this test. Test duration and voltage are explained above. Transformers with U m> 72,5 kV this transformers shall all, if not otherwise agreed, be tested with partial discharge measurement. The partial discharge performance shall be controlled according to the time sequence for the application of the voltage as shown in figure 7.2 :



Warranty: 365 days    Goods status: new/used      Shipping method: Courier delivery


Our products

A company specializes in the sales of module spare parts of global famous brands (DCS system) (robot system) (large servo control system). The company's products include distributed control system (DCS), programmable controller (PLC), MOTOROLA MVME industrial module, industrial control communication converter (Anybus), remote output/input module (RTU), industrial computer (IPC), industrial low screen screen (IPC) HMI SCSI (50, 68, 80Pin) AnyBus (Gateway) has become a global sales enterprise of industrial automation spare parts and components


non-uniformly insulated windings : 

For three phase transformers, two test sets are required ; 1. A phase-to-earth test with rated withstand voltages between phase and earth with partial discharge measurement. 2. A phase-to-phase test with earthed neutral and with rated withstand voltages between phases with partial discharge measurement. The test shall be carried out in accordance with uniformly windings ( subclause a ). On single –phase transformers, only a phase-to-earth test is required.