FOXBORO AD198GV Switch input module
This standard is subject to revision as new materials and methods of construction are
developed. The latest revision of this standard shall be applicable. Revised sheets shall be
issued from time to time and should be inserted as soon as these are received. Superseded or
obsolete sheets shall be removed immediately upon receipt of revised sheets. The date of the
latest issue of each sheet is printed at the top corner under the standard number.
Warranty: 365 days Goods status: new/used Shipping method: Courier delivery
About us
We are professional company and we are expert in this business, we have highly experienced production team, or sales team, or purchase team, we have most advanced production line. We are reputable in the market.
RIGHT-OF-WAY
If required by the local authority, the right-of-way (R-O-W) for the proposed route of an underground cable must be obtained from the concerned authority (e.g. municipality,ministry of communication) during engineering stage of the project. Given below is the procedure to be followed in obtaining R-O-W: ¾ Prepare R-O-W drawing proposed showing proposed route of the underground cable, cross-section of the trench or duct bank (if required ) and location of other utilities (e.g. telephone, water, sewer) lines along proposed route (if known).
This article from the temporal Ming sheng automation equipment co., LTD., reproduced please attach this link: http://www.stockdcs.com/