FORCE CPU-2CE/16 Serial Link Controller
• Obtain necessary permissions from the traffic police for the work schedule, warning and lights and design of detours.
• Keep ready the necessary number of night warning lamps, stands, wooden/steel bridges for maintaining pedestrian
• Arrange necessary manpower keeping in view the work schedule and expiry date of digging permit.
NOTE: The construction of lying three cables or more is the same as lying one or two cables, but in three or more we required cement to obtain 5% concentration.
Warranty: 365 days Goods status: new/used Shipping method: Courier delivery
About us
We are professional company and we are expert in this business, we have highly experienced production team, or sales team, or purchase team, we have most advanced production line. We are reputable in the market.
Excavation
In deciding at what depth the trench should be excavated, it is necessary to take into consideration the changes being made in the existing grade level by any earth cut or fill work to be carried out later. Such information should be gathered from the Ministry of communications or municipality so that ultimately the standard depth of cable can be achieved.
This article from the temporal Ming sheng automation equipment co., LTD., reproduced please attach this link: http://www.stockdcs.com/