Home > Product > Robot control system > FISHER 67DF-2343 Pressure Regulator

  • FISHER 67DF-2343 Pressure Regulator
FISHER 67DF-2343 Pressure Regulator

FISHER 67DF-2343 Pressure Regulator

FISHER 67DF-2343 Pressure Regulator

Backfilling and Reinstatement Backfilling and reinstatement of the trench shall be in accordance with the requirements of the authority (e.g. municipality. MOC, etc.) under whose jurisdiction the area falls. Warning tapes shall be laid in the backfill.

• All concrete surfaces in contact with ground shall be provided with two (2) layers of polyethylene vapor barrier / Each layer shall be six (6) Mil Thickness and in Accordance with ASTM-2103.




Warranty: 365 days    Goods status: new/used      Shipping method: Courier delivery

About us

We are professional company and we are expert in this business, we have highly experienced production team, or sales team, or purchase team, we have most advanced production line. We are reputable in the market.




• Concreting shall not be allowed with out vibration at any time. 

• Curing of concrete shall be done by gunny bags for curing compound. 

• Cement shall be type 1 and in areas having water logging and salinity, Sulphate resistant cement type 5 may be used. SEC Engineer shall direct to the type of cement to be used.  

• Water shall be free from silt, organic matter, alkalies or other impurities.


 This article from the temporal Ming sheng automation equipment co., LTD., reproduced please attach this link: http://www.stockdcs.com/


Obtain the latest price of FISHER 67DF-2343 Pressure Regulator