• The average grain size of sand is 0.35mm and the mud content shall not be more than 5%.
• Forms to be used, these shall be sufficiently tight to prevent loss of mortar from concrete and shall be maintained rigidly in position until concrete has hardened enough to prevent damage by the removal.
• If required by SEC Engineer, the concrete foundation sample test of Pole and anchor shall be carried out. The concrete sample to be crushed after seven days.
Warranty: 365 days Goods status: new/used Shipping method: Courier delivery
About us
We are professional company and we are expert in this business, we have highly experienced production team, or sales team, or purchase team, we have most advanced production line. We are reputable in the market.
• All lean concrete under reinforced
base to be premixed from factory with 250 kg cement/M2 of concrete minimum strength 14 N/mm2 .
• Lean concrete 15 Cm thick shall be used all around the 15 Cm Dia P.V.C Pipes running underground.
• All R.C.C to be premixed from factory with 350 kg cement/M2 of concrete minimum strength 21 N/mm2 (3000 P.S.I).
• Sand should be coarse grained, clean and free from all foreign matter.